Ruby on Rails Consulting in Netherlands: Upgrades, Performance & DevOps

Senior Rails consultants for upgrades, performance audits, and CI/CD. Ship faster with Rails 8, Ruby 3.3, and production-ready DevOps.

Posted By: Asistensia Team, August 22, 2025

Ruby on Rails Consulting in Netherlands: Upgrades, Performance & DevOps

Ruby on Rails Consulting — practical help when your product needs to move faster.

If you’re carrying tech debt, stuck on an old Rails version, or fighting slow pages and flaky deploys, you don’t need a pep talk—you need a plan. This page outlines how we upgrade Rails apps to Rails 8 (with Ruby 3.3), fix performance bottlenecks, and set up CI/CD so you can ship reliably. Whether you’re a startup stabilizing a growing product or an established team preparing for a major release, our approach is hands-on, measured, and focused on outcomes.

Below, we’ll cover five areas: when to hire, upgrades & migrations, performance, DevOps/SRE, and how we work.



1. When to Hire Rails Consultants: Symptoms & Outcomes


If any of these feel familiar, bringing in senior Rails help is usually ROI-positive within weeks:

  • Releases are unpredictable; hotfixes dominate the roadmap.
  • Rails 5.x/6.x/7.x with unmaintained gems makes upgrades risky.
  • p95 interaction delays, timeouts, and N+1 queries hurt conversion.
  • CI pipelines take 20–40 minutes; failures feel random.
  • On-call is noisy; little visibility into errors and slow queries.

What you should expect from us:

  • Predictable releases (stabilized CI, clear branching & reviews)
  • Faster app (LCP ≤ 2.5s, INP ≤ 200ms, CLS ≤ 0.1 targets)
  • Modern stack (Rails 8 + Ruby 3.3, audited dependencies)
  • Sane operations (observability, runbooks, error budgets)

CTA: Book a free consultcontact@asistensia.com



2. Rails Upgrades & Migrations: From Risky to Routine


Typical starting points

  • Rails 5.2/6.0/6.1/7.x → Rails 8, plus Ruby 3.3
  • Gem ecosystem audit (security, maintenance, forks)
  • Frontend: ERB/Hotwire (Turbo/Stimulus) or SPA boundaries

How we de-risk upgrades

  1. Compatibility audit — deprecations, gems, frameworks, CI.
  2. Dual-boot (if needed) — run old/new Rails in parallel.
  3. Incremental PRs — small, testable steps with feature flags.
  4. Zero/low-downtime deploys — DB migrations, background jobs.
  5. Rollbacks & monitoring — alerts, dashboards, error tracking.

Deliverables

  • Upgrade plan & timeline, risk register, gem decisions
  • Passing test suite and green pipeline
  • Post-upgrade hardening (security, performance quick wins)

Links: Rails upgrade guideRelated posts



3. Performance & Scalability: Faster Pages, Happier Users


Where we look first

  • Database: slow queries, missing indexes, connection pool size
  • App layer: N+1s, caching strategy, background vs inline work
  • Frontend: image sizing, asset pipeline, hydration cost
  • CWV: LCP (hero render), INP (long tasks), CLS (layout shifts)

Common fixes

  • Query plans & indexes; partitioning for large tables
  • Caching (fragment/low-cardinality), job queues (Sidekiq), rate limits
  • CDN for static assets; image compression; proper width/height
  • Bundle/JS diet; defer non-critical scripts; preconnect fonts

Measuring impact

  • Baseline → changes → remeasure with dashboards & CrUX/PSI
  • Target: LCP ≤ 2.5s, INP ≤ 200ms, CLS ≤ 0.1
  • Report with before/after, rollback notes, and owner assignments


4. DevOps, SRE & Reliability: CI/CD that You Can Trust


Tooling we prefer

  • GitHub Actions, Docker, Terraform, Kubernetes (when warranted)
  • Monitoring: Prometheus/Grafana, logs/metrics/traces, Sentry
  • Blue/green & canary; feature flags; automated rollbacks

What we implement

  • 10–20 min pipelines with test sharding & caching
  • Immutable builds and environment parity
  • Runbooks & SLIs/SLOs with alerting that respects sleep

Results

  • Higher deploy frequency, lower MTTR, calmer on-call


5. How We Work: A Clear Path from Audit to Outcomes


Engagement flow

  1. Discovery (free) — goals, constraints, success metrics
  2. Technical audit (1–2 weeks) — code, DB, infra, performance, security
  3. Plan & estimate — milestones, risks, owner map
  4. Build & iterate — weekly demos, pairing, PR reviews
  5. Handover — docs, runbooks, training, backlog for the next quarter

Models

  • Fixed-scope delivery (audits, upgrades, performance sprints)
  • Team extension (embed senior Rails engineers)
  • Maintenance retainer (security updates, SLAs)

CTA: Get a tailored estimate




Summary: Upgrade, Accelerate, and Ship with Confidence


Rails consulting overview: upgrades, performance, DevOps, and process

We help teams modernize Rails apps, speed up pages, and make deploys boring—in the best way. Start with a small, time-boxed audit, then decide how far to take it.



FAQ


Do you work with legacy versions? Yes. We regularly migrate from Rails 5.x/6.x/7.x to Rails 8 and Ruby 3.3.

Can you collaborate with our existing team? Absolutely. We pair, review PRs, and transfer knowledge as we go.

How quickly can you start? Audits often begin within 1–2 weeks. Delivery timelines depend on scope.

Do you handle security and compliance? Yes—dependency audits, secrets management, and least-privilege access. We’ll align with your compliance requirements.

Where are you based? Netherlands, working with clients across EU/UK/US/GCC.



Final Thoughts

Rails is still one of the fastest ways to ship solid product. With the right upgrade path, performance guardrails, and CI/CD, your team can move quickly without breaking things. If that sounds like the next step for your product, we’re ready when you are. Book a consultcontact@asistensia.com



Written by Asistensia.

Asistensia Team helps product teams upgrade to Rails 8, fix performance, and build reliable delivery pipelines. We work as embedded partners or on focused, fixed-scope engagements.